Installation

On this page: the order in which to read and do the installation chapters, and the rules that apply on site.

Order of work

  1. Choose the board and build for this pool: Choose hardware and build.
  2. Unpack and check the box: What is in the box.
  3. Safety first: Electrical installation and safety. Decide which work needs a licensed electrician.
  4. Wire power, network, bus and inputs: Wiring the box.
  5. Own probes if the pool has none that can be read: Own probes and flow cell.
  6. Commission on site, step by step: Commissioning checklist.

Rules on site

  • Lutra reads; the pool's own controllers keep control and keep their safety functions.
  • Nothing on the DO terminals before Lutra firmware is on the board, and never a load directly.
  • If the bus already has a master, Lutra only listens.
  • The network and "changes from the cloud" are only set on site; take your time to finish the setup before the temporary network closes.

Last reviewed: 2026-11-24. Applies to Lutra Lite 0.4.1.