Commissioning checklist¶
On this page: a checklist for commissioning one box at one pool. Work through it in order; each step links to the page with the details. Print it or keep it open on your phone.
1. Before you go¶
- Board and build chosen for this pool. See Choose hardware and build.
- The pool equipment is in the supported devices list; you know its Modbus address and bus parameters, or plan to use the bus scan.
- Client and pool exist in Lutra Insight, or you have the rights to create them on site.
- The box runs Lutra firmware of the right board and build. A new board runs factory firmware that switches its outputs: flash it first with the web flasher.
- The box's pairing code (
LP-XXXX-XXXX) is at hand. - For the switching build: a licensed electrician is booked for the relays, interlocks and mains work.
- You carry a phone, a laptop with Chrome, Edge or Opera, and a USB-C data cable.
2. Safety¶
- Read Electrical installation and safety. Mains work only by a licensed electrician.
- Nothing connected to the DO terminals (read build), or only relay coils through the electrician's installation (switching build).
- If the bus already has a master (PLC, control panel), Lutra will only listen. Never add a second master.
3. Mount and wire¶
- Box on the DIN rail; antenna connected if Wi-Fi is used. See Wiring the box.
- RS485 A, B and 0V connected; termination only on the last device of the bus.
- On a Jandy bus: POS not connected.
- Contacts on the digital inputs (flow switch, pump running, levels), NC where possible.
- Network cable or PoE connected, or Wi-Fi signal checked at the box's location.
- Power connected.
4. Power on¶
- LED (8DI-8DO): green short flash every 2 s (nothing set up yet) or blue slow blink (setup window open). See LED and BOOT button.
- Temporary network
Lutra-XXXXXXvisible on your phone. If not: hold BOOT for 3 seconds.
5. Setup page: devices first¶
- Join
Lutra-XXXXXXand open the setup page (http://192.168.4.1if it does not open by itself). See Setup page. - Status shows the expected firmware version and build.
- For each bus device: make and model, address, Check shows plausible values, Add to list.
- Save the device list. Readings appear live on the page.
- Roles assigned to the connected digital inputs; open and close each contact once and watch the state change. See Digital inputs.
- Switching build only: outputs configured and each function tested with the electrician present. See Switching build.
- Changes from the cloud set as agreed with the partner and the owner (off unless agreed).
6. Setup page: network last¶
- Network chosen (cable, or Wi-Fi with password) and Save & Connect pressed.
- LED yellow double blink, then green. If the page reports a failure, correct it in the window that opens again. See Network.
7. Pair in the portal¶
- In Lutra Insight: open the pool, Boxes, Add box with pairing code, enter the code, Activate. See Pairing a box.
- LED changes from green breathing to green steady.
8. First readings¶
- The pool page shows tiles with values and "last seen" for the box. The box sends every 5 minutes by default, and immediately when a state changes.
- Values are plausible compared with the equipment's own display.
- If the pool uses trichlor (with CYA): rely on pH and free chlorine rather than ORP.
- Alert limits checked for this pool, email alerts on. See Alerts and visits.
To be confirmed
How soon after activation the first reading appears in the portal.
9. Handover¶
- Note in the portal or your records: MAC address, firmware version, board and build, bus devices with addresses, input roles.
- Owner invited to the owner view if agreed. See Pool owners.
- Setup window closed (it closes by itself after a successful connection).
- The owner knows that the pool works as before without Lutra, and whom to call.
Related pages¶
Last reviewed: 2026-11-24. Applies to Lutra Lite 0.4.1.